Expected value (EV)
At a glance
The average long-run result of a decision, weighing each outcome by its probability.
How it is computed
EV = Σ (probability × payoff)
70% to win 100, 30% to lose 80 → 0.7 × 100 − 0.3 × 80 = +46
EV is a long-run average: any single result can be the exact opposite.
In depth
Expected value (EV) is the long-term average outcome of a decision, calculated by weighting each possible result by its probability. It provides a mathematical framework to assess the profitability of choices over repeated trials, distinguishing consistent gains from short-term variance. EV reflects probability-weighted averages rather than single-event results, guiding strategic evaluation in decision-making.
How this term relates to others
This definition itself leans on 1 other terms. Reading them removes the need to memorise it: its meaning is bounded by those concepts together.
More
Across the glossary there are 390 such definition cross-references covering 71 terms, with 18 not yet referenced by any definition.
Same category: math and odds
By the keywords in its definition this term falls under “math and odds”, which holds 13 entries in the glossary; 8 of them are listed here. Reading a category together builds a complete decision chain faster than reading alphabetically.
Easily confused with
These are the words most often swapped for this one at the table, and they compute different things.
- Pot odds
- Pot odds compares one call against one price; EV multiplies every outcome by its probability and sums them, including future streets.
Chinese: 期望值 (EV)